11.120.015 Attached drawings.
The following drawings are attached to the guidelines codified in this chapter:
(a) DG-08-01. Rectangular Cross Section Wetwells for Non-Clog Pumps and Valve Vault Layouts.
(b) DG-08-01A. Circular Cross Section Wetwells for Non-Clog Pumps and Valve Vault Layouts.
(c) DG-08-01B. Wetwells for Grinder Pumps and Valve Vault Layouts.
(d) DG-08-02. Non-Clog Pump Site Layout, Water Piping Schematic and Valve Vault Layout.
(e) DG-08-02A. Grinder Pump Site Layout, Water Piping Schematic and Valve Vault Layout.
(f) DG-08-03. Power Distribution One Line Diagram.
(g) DG-08-04. Pump Control Schematics.
(h) DG-08-04A. Power and Control Enclosure Details.
(i) DG-08-04B. Schedules for Panels “H” and “L”.
(j) DG-08-05. SCADA System Schematic.
(k) DG-08-06. Heating and Ventilation, and Air Analyzer Schematics.
(l) DG-08-07. SCADA Pole Details and SCADA System Block Diagram. (Design Guideline DG-08, dated August 2006)