Title 11 INFRASTRUCTURE MANAGEMENT
This title is included in your selections.
Chapters:
- Subtitle I. Capital Projects
- Subtitle II. Construction Management
- Subtitle III. Reserved
- Subtitle IV. Infrastructure Engineering, Design and Review
- 11.110 Addition, Deletion, or Revision of Computer Aided Design and Drafting (CADD) Standards
- 11.115 Comprehensive Collection System and Maintenance Plan – New Sewer Design and Construction
- 11.120 Mechanical and Electrical Design Guidelines for Low-Flow Wastewater Pumping Stations Using Submersible Nonclog Pumps or Submersible Grinder Pumps
- 11.125 Mechanical and Electrical Design Guidelines for Water Booster Pumping Stations
- 11.130 Pipeline Design Manual
- 11.135 Procedures for Issuing WSSC Construction Permits
- 11.145 Standard Procedure for Pipeline As-Builts
- Subtitle V. Water and Sewer Service Authorization