- Washington Suburban Sanitary Commission
- Code of Regulations
- Title 11, Infrastructure Management
- Title 11 Subtitle IV, Infrastructure Engineering, Design and Review
- Ch. 11.120, Guidelines for Low-Flow Wastewater Pumping Stations
- Ch. 11.120 Art. VII, Standby Generator
- 11.120.430, Automatic transfer switch
History of This Section WSSC 11.120.430, Automatic transfer switch
-
- Added
- by Design Guideline DG-08 § 18.2.5