Bill number does not exist. Enter a vaild keyword.

Statutes Text

Article - Public Utilities




§20–101.

    (a)    In this subtitle the following words have the meanings indicated.

    (b)    “Design/build contract” means a contract that provides for both architectural and engineering design services and construction services as a part of a single contract.

    (c)    “Evaluated bid price” means the price of a bid after adjustment in accordance with objective measurable criteria.

    (d)    “Facilities construction contract” means a contract that provides services for the construction of:

        (1)    a water or wastewater treatment plant;

        (2)    a water or wastewater pumping station and related force mains in the pumping station site limits;

        (3)    a water storage facility;

        (4)    a wastewater storage facility;

        (5)    a building for Commission purposes; or

        (6)    a pipeline.

    (e)    “Objective measurable criteria” means standards that enable the Commission to compare the economy, effectiveness, or value of the subject of the bids.



Click to return on the top page