(a) Organizationally, the Engineering and Environmental Services Division and the Pipeline Construction Division are in the Engineering and Construction Department. Approval of the standard procedure codified in this chapter defines standard operations within this Department.

(b) The Engineering and Environmental Services Division enforces the conditions of the approved utility erosion and sediment control plan and permit issued to the contractor for each water, sewer, and storm drain project awarded by the Commission.

(c) The Pipeline Construction Division enforces the conditions of the contract awarded to contractors for Commission water, sewer, and storm drain projects, including all erosion/sediment control measures required by the contract and/or permit.

(d) This chapter establishes the interrelationships of these authorities. (Amended during 2019 codification; ENG 86-01 § 2)