Skip to main content
Loading…
This section is included in your selections.

Painting inside the wetwell and valve vault shall conform to the WSSC Standard Specification Section 09900 and the attached standard Piping Color and Identification Schedule for WSSC wastewater facilities.

PVC pipes, stainless steel pipes, copper pipes and concrete need not be painted.

Specification Section 09900 shall be suitably edited to reflect this. (Design Guideline DG-08 § 11.0, dated August 2006)